    Construction Update!

    Below is the snapshot of shotcrete being carried out on the West side as per our update from last week. Framing hold downs and plumbing fixtures are being currently placed on the East side as seen below. Ramp pour on the west side is currently scheduled for 9/27. The pouring activities will be utilizing only one lane of the 165th street from approximately 1PM (PST) to 5PM (PST), while the other lane will remain open to traffic. There will be one traffic controller present on
    Construction Update

    Construction Update

    As of Friday (9/14), we have completed the concrete pour for West P1 PT deck! Typical traffic control measures across 165th were as seen in the below image. Our men in action on the day of pour! Shotcrete on the south side is currently scheduled for 9/19 & 9/21. The shotcreting activities will be utilizing only one lane of the 165th street from approximately 10AM (PST) to 3PM (PST), while the other lane will remain open to traffic. There will be one traffic controller present
    Concrete Pour on Sep 14th - Expect noise and heavy truck traffic

    Concrete Pour on Sep 14th - Expect noise and heavy truck traffic

    Friday 10/14, We will pour our first PT deck! TRAFFIC: There will be continuous concrete truck traffic on Dexter Ave. The sidewalk and bike lane will be closed on the East side of Dexter Ave. Please watch out for our flaggers as they guide traffic to allow concrete trucks to access site. NOISE : The crew will start setting the concrete pumps at 5 AM and the pour will start at 6 AM. Noise to be expected from 5 AM and last all day. Thank you for your cooperation and understandi
    Construction Update!

    Construction Update!

    As of Wednesday (9/6/18), we are getting ready for P1-West PT deck concrete pouring scheduled for Thursday (9/13) and have already completed the pour for P1-East! Concrete pumping activities on Thursday (9/13) will be utilizing only one lane of the 165th Street from approximately 7AM to 4PM. There will be two traffic controllers present on 165th during this time period to facilitate a smooth traffic flow from & around the jobsite. Shotcrete east of G5 to be continued on Frida
    • LinkedIn - Grey Circle

    Employees    Subcontractors

    Careers     Contact

    11332 NE 122nd Way, Suite 350, Kirkland, WA 98034  |  p: 206.320.8741  |  f: 206.323.4719  | info@compass-gc.com

    © 2020 by Compass Construction Management, LLC. Established 1998  |  Terms of Use