July 13, 2018

The tower crane erection is scheduled for Monday (7/16) followed by load testing on Tuesday (7/17).

The erection activities will be utilizing only one lane of the 165th street from 7AM (PST) to 7PM (PST), while the other lane will remain open for traffic. There will be...

July 6, 2018

As of this week,

The crane base section and embeds are here!

The steel reinforcement for crane footings, elevator pit and sand/oil separator were placed followed by concrete pouring. You may have noticed the concrete pump extending towards the middle of the site from 165...