Stream Dexios' tower crane will be dismantled on Saturday 5/4/19. The crew will be on site at about 5 AM.

TRAFFIC: During the dismantle, we will maintain one-lane traffic control with periodic street closures. There will be no parking 3 AM to Midnight on Dexter between...

February 12, 2019

This month, concrete pours will pick up steam as we work our way out of the hole. Expect dirt and concrete trucks entering and exiting the site from 200th St SW.

December 4, 2018

Monday 12/10, We will pour our fourth PT deck! 

TRAFFIC: There will be continuous concrete truck traffic on Dexter Ave. The sidewalk and bike lane will be closed on the East side of Dexter Ave. Please watch out for our flaggers as they guide traffic to allow c...

November 8, 2018

Monday 11/12, We will pour our third PT deck! 

TRAFFIC: There will be continuous concrete truck traffic on Dexter Ave. The sidewalk and bike lane will be closed on the East side of Dexter Ave. Please watch out for our flaggers as they guide traffic to allow co...

October 18, 2018

Monday 10/22, We will pour our Second PT deck! 

TRAFFIC: There will be continuous concrete truck traffic on Dexter Ave. The sidewalk and bike lane will be closed on the East side of Dexter Ave. Please watch out for our flaggers as they guide traffic to allow c...

October 8, 2018

A snap from top of our tower crane as we mark the end of summer!

Back-fill on the west side is currently scheduled for 10/8. The Telebelt machine will be utilizing only one lane of the 165th street from approximately 8AM to 5PM, while the other lane will remain open to...

September 24, 2018

Below is the snapshot of shotcrete being carried out on the West side as per our update from last week.

Framing hold downs and plumbing fixtures are being currently placed on the East side as seen below.

Ramp pour on the west side is currently scheduled for 9/27. The pou...

September 14, 2018

As of Friday (9/14), we have completed the concrete pour for West P1 PT deck!

Typical traffic control measures across 165th were as seen in the below image.

 Our men in action on the day of pour!

Shotcrete on the south side is currently scheduled for 9/19 & 9/21. The shot...

September 12, 2018

Friday 10/14, We will pour our first PT deck! 

TRAFFIC: There will be continuous concrete truck traffic on Dexter Ave. The sidewalk and bike lane will be closed on the East side of Dexter Ave. Please watch out for our flaggers as they guide traffic to allow co...

September 6, 2018

As of Wednesday (9/6/18), we are getting ready for P1-West PT deck concrete pouring scheduled for Thursday (9/13) and have already completed the pour for P1-East!